San Francisco Bay Area • Staff Software Engineer
Distributed Systems • Telemetry • Real‑Time Data • Geospatial
Website: https://kuanbutts.com
Email: [email protected]
San Francisco Bay Area • Staff Software Engineer
Distributed Systems • Telemetry • Real‑Time Data • Geospatial
Website: https://kuanbutts.com
Email: [email protected]
| import random | |
| class Passenger: | |
| """Passenger with seating ticket.""" | |
| def __init__(self, seat: int): | |
| self.seat_assigned = seat | |
| self.seat_taken = None | |
| self.is_rogue = False # if rogue, pax will sit in wrong seat | |
| def make_rogue(self): |
| ,PROJECT,CONTRACT NO.,CHANGE ORDER NO.,APPROVED DATE,CONTRACTOR,CATEGORY,TITLE,AMOUNT ($),DESCRIPTION,AUTHORITY APPROVER,CONTRACTOR COUNTERPARTY,CONSULTANT SUPPORT | |
| 0,CP 1,HSR 13-06,00386,6/25/2021,Tutor Perini/Zachry/Parsons,Differing Site Conditions,"AT&T Task 4, Phase II MH-769 Caltrans Water Service Relocation - Construction","$36,061.19",This is a change to a contract for construction services in the Central Valley. The reason for the change is to fully compensate the Contractor for the work performed to relocate the existing Caltrans 2-inch irrigation water service line located at Ashlan Avenue across SR-99 on-ramp. This service line was in physical conflict with the proposed location of the AT&T intercept vault requiring the waterline relocation outside of the proposed AT&T intercept vault footprint location.,Scott Kennedy - Senior Contract Manager,Ghassan Ariqat - Project Manager/Director,Eric Stassevitch - DB Oversight Manager | |
| 1,CP 1,HSR 13-06,00119.1 R1,4/2/2021,Tutor Perini/Zachry/Parsons,Third Part |
| <!DOCTYPE html> | |
| <html lang="en"> | |
| <head> | |
| <meta charset="UTF-8"> | |
| <meta name="viewport" content="width=device-width, initial-scale=1.0"> | |
| <meta http-equiv="X-UA-Compatible" content="ie=edge"> | |
| <title>Traffic Simulation</title> | |
| </head> | |
| <body> | |
| <h3>Controls</h3> |